My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-13_REVISION - M2017035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2017035
>
2020-10-13_REVISION - M2017035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 4:12:43 AM
Creation date
10/14/2020 9:18:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017035
IBM Index Class Name
REVISION
Doc Date
10/13/2020
Doc Name
Adequacy Review Response
From
Miners Mall, LLC
To
DRMS
Type & Sequence
AM1
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: Oct. 2017 and completion: Sept. 2021r <br /> 2) How many years is the mine anticipated to be operational: 4ww -f"WJ years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> (fD) all-yearlong or(_gb seasonally, explain: subject to winter closure based on snowfall <br /> 4) How many aces of the mine site will be disturbed at any given time: 0.5 acres <br /> 5) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches �6-8 inches <br /> 8-10 inches 10-12 inches <br /> Other: <br /> N/A, explain: Current soil is a mix due to previous mining- Will be sorting all soil & rock <br /> 6) Will you need to move any overburden (check one): ( W1 )Yes or No <br /> a. If yes, approximately how thick is the overburden? 2 to 5 feet <br /> 7) How will the mine be accessed: (-a) existing roads (_E�g new roads will be created <br /> Please describe the existing roads: <br /> Currently using existing hile*n-ff trn*1 Tharawaho sand tr;j*1r. tha ;irp;i ahava <br /> --storical road <br /> the mine. nee.--t-ey.Is iw i l 1 be� 1 en rune oe_al a-, � atnw�t�wl � att� (1(fp <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements. <br /> two / y t` e_,�' /' &AIV-Ms ujr(( 6,34 bP_ Axaki 4-:Q <br /> --9�'AAC -4-KCAr IS ,f- Q/K-e1«sf K►ry rS n �1�/c`t� <br /> T <br /> 8) Will water be needed during the mining operation (check one): ( W ) Yes or (_n)No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> Water will be packed in for use in a backpack-type sprayer for dust control. BLM wants 2 of these type <br /> of sprayers on site for fire control. Up to 200 gallons of water may be stored on site during summer. <br /> 9) Will any water diversions or impoundments be constructed (check one): (-a) Yes or No <br /> a. If yes, please describe the water diversions or impoundments: <br /> Will be using weed-free straw bales to prevent topsoil loss at cliff edge and around topsoil pile <br /> 10)Will any chemicals be used during the mining process (check one): ( F-1 ) Yes or (-Z) No <br /> a. if yes, please describe the chemical types and quantities to be utilized, chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.