My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-12_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2020-10-12_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2020 8:24:40 AM
Creation date
10/13/2020 7:50:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
10/12/2020
Doc Name Note
For PR10
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Volume 4 of the Trapper Mine permit application includes an assessment of the probable <br /> hydrologic consequences of the proposed mining operation. Each year, Trapper assesses <br /> the ongoing impacts to the hydrologic system in its annual hydrologic report submitted as <br /> Appendix W of the permit application. The probable hydrologic consequences as set forth <br /> in Volume 4 and Appendix W are summarized below. <br /> A. Water Quality Standards and Effluent Limitations <br /> Surface discharge at the Trapper Mine is monitored under CDPS permit#CO-0032115 <br /> issued by the Colorado Department of Public Health and Environment. In addition, <br /> the applicant has quarterly reporting requirements as part of its surface water <br /> monitoring program. Acute toxicity testing through bio-monitoring sampling is <br /> required in the following drainages if mine-contaminated water is discharged: <br /> 1. East Flume 2. East Middle Flume 3. East Pyeatt <br /> 4. Horse 5. Middle Flume 6. Oak <br /> B. Diversions and Conveyance of Overland Flow <br /> Drainageway reconstruction is discussed under Section 4.8. 1.3,Vol. IV of the permit <br /> application. Channel lining structures,retention basins, and artificial channel <br /> roughness structures are proposed for use to control erosion. The applicant uses rock <br /> check structures,various geotextiles, and rapid growing vegetation within <br /> reconstructed drainages to control erosion. (4.05.4(2)(a)). <br /> C. Sedimentation Ponds <br /> Sediment ponds are discussed under Section 4. 8. 1.4, Vol. IV of the permit <br /> application. <br /> The applicant uses sedimentation ponds in all disturbed drainages to control increased <br /> sediment loads resulting from disturbance within the ephemeral drainages on the mine <br /> site. All sediment ponds are designed to contain or treat, at a minimum,the 10-year, <br /> 24-hour event and to safely pass the 25-year, 24-hour event. One MSHA size pond <br /> exists on the site in the Coyote drainage. <br /> As per RN6 Portions of haulroads,topsoil stripping areas and mining areas are <br /> projected for the next permit term (2013-2017)outside of the currently approved <br /> drainage and sediment control plan boundaries. Given this,the Division proposed <br /> to approve the renewal application (RN-6)with the following stipulation: <br /> Stipulation No. 21: <br /> The operator must submit and receive approval for a permit or technical revision <br /> to update the drainage and sediment control plan prior to any disturbance outside <br /> of the currently approved drainage and sediment control plan boundary. <br /> As of November 2017 this stipulation has been met as follows: <br /> Trapper submitted pond designs for Deacon and Jeffway ponds. DRMS reviewed <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.