Laserfiche WebLink
BULLDOZER WORK <br />Site: <br />Task description: Replace Topsoil on Drill Pads and Roads <br />CAM Stove Canyon Expl Permit Action: <br />Project 2020 Update Permit/Job#: X200415313 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 10/7/2020 County: Garfield <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D6T XL <br />Horsepower: <br />185 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Abbreviation: None <br />Filename: 004 <br />$68.78 <br />Utilization % <br />NA <br />$58.85 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.30 <br />NA <br />$168.92 <br />$168.92 <br />MATERIAL QUANTITIES <br />Initial Volume: 5,760 <br />Swell factor: 1.125 <br />Loose volume: 6,480 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />100 feet <br />303.3 LCY/hr <br />Partly consolidated stockpile 1.1 <br />0% <br />6,600 feet <br />2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />