Laserfiche WebLink
Page 14 of 14 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Non-Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.86 <br />0.86 <br />0.86 <br />0.86 <br />0.00 <br />NA <br />0.00 <br />NA <br />1.71 <br />1.71 <br />GRAND JUNCTION <br />30.00 miles <br />35.00 mph <br />$2,135.77 <br />$49.44 <br />Total job time: 3.43 Hours <br />Total job cost: $2,185 <br />CIRCES Cost Estimating Software <br />