My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-02_APPLICATION CORRESPONDENCE - X202023203 (5)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
X202023203
>
2020-10-02_APPLICATION CORRESPONDENCE - X202023203 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 2:38:49 PM
Creation date
10/5/2020 9:53:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X202023203
IBM Index Class Name
Application Correspondence
Doc Date
10/2/2020
Doc Name Note
Notice of Intent - Revised Application
Doc Name
Application
From
New Elk Coal Company
To
DRMS
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division Procedures: <br /> 1. The Division shall review the complete Notice of Intent to Conduct Coal Exploration and shall <br /> make a determination within two weeks of the filing of such complete Notice, whether the <br /> proposed exploration will substantially disturb the natural land surface, and if so, whether the <br /> proposed activity qualifies as coal exploration or surface coal mining operations. The Division <br /> shall immediately notify you in writing of its determination. The determination of substantial <br /> disturbance shall include, but not be limited to, consideration of the performance standards <br /> listed in Rule 4.21.4. If the Division determines that the proposed coal exploration activities <br /> will substantially disturb the natural land surface,you must comply with Rule 4.21. (NOTE: If <br /> you feel that the activities will substantially disturb the land, as "substantially disturb" is <br /> defined by Rule 1.04, you may attach or enclose your exploration and reclamation plan as it <br /> complies with Rule 4.21.) <br /> 2. If the Division determines that the proposed coal exploration activities qualify as surface coal <br /> mining operations, the application shall be returned to the person with the written <br /> determination. The person shall be informed of his rights to appeal such determinations and <br /> that conduct of any activities included in the application are prohibited until a valid mining and <br /> reclamation permit is obtained. <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.