Laserfiche WebLink
Nominal 50' to 75' x 100' Drill Pad Nominal 50' to 75' x 100' Drill Pad <br /> Constructed on 3H: 1 V Slope Constructed on 3H: 1 V Slope <br /> Utilizing Existing Road as Port of Pad Reclaimed Configuation <br /> Q m <br /> FFe Foe <br /> FOR <br /> Foe FF6 <br /> 0.25h:1 v g•0-r <br /> Cuttings)-Puids 0 Reclaimed Area <br /> Pit <br /> Fee Fee <br /> Tgosoi Stockpos <br /> Slope Slope <br /> Access Road Access Road <br /> New Construction (Reclaimed) <br /> 40 Silt Fence 40' Silt Fence <br /> During Drilling During Drilling <br /> 20'Minimum 20'BERM 20'Minimum <br /> Approximate Cut Area = Z550 SF <br /> Topsoil 0 1' Thick = 94 CY Approximate Reclaimed Area = 2,550 SF = 0.06 Ac <br /> Approximate Cut = 394 CY Place brush along berm and upgradient of silt fence <br /> C to improve sediment capture <br /> Cut Stored on Pad 1.6' Deep <br /> Q m <br /> A-A' Operational Surface B-B' Reclaimed Surface <br /> 120 Jh•1 v xistin Surlbce 120 — Post drilling Surface <br /> 11 <br /> W 110 0.25h:1 v W 110 — -- <br /> Bean � <br /> _ Access Rood <br /> Operational Surface a)j 100 — ew Construe ion 100 _ <br /> Q 90 Q 90 —_- <br /> 0+00 0+50 1+00 1+50 0+00 0+50 1+00 1+50 <br /> Station (ft) Station (ft) <br /> Map 3 <br /> Lorencito Tract <br /> Typical Drill Pad <br /> Natural Hillside Configuration <br /> DESIGNED BY: * DATE: 8/28/2020 <br /> DRAWN BY: N. Mason Lorencito NOI <br />