My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-02_REVISION - C1981018 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2020-10-02_REVISION - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 3:37:28 AM
Creation date
10/5/2020 9:45:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/2/2020
Doc Name
Adequacy Review Response
From
Blue Mountain Energy
To
DRMS
Type & Sequence
MR178
Email Name
CCW
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEDCAD 4 for Windows <br /> r,.,.. -l oon_gym n P-i,4 <br /> 35 <br /> w/o Freeboard w/Freeboard <br /> Froude Number": <br /> Manning's n*: <br /> Dmin: 3.00 in <br /> D50: 9.00 in <br /> Dmax: 11.25 in <br /> Velocity and Manning's n calculations may not apply for this method. <br /> structure#1 (Pond11 <br /> Main Sediment Pond <br /> Pond Inputs: <br /> Initial Pod Elev: 5,626.00 ft <br /> Initial Pod: 1.44 ac-ft <br /> *Sediment Storage: 3.57 ac t <br /> Dead Space: 20.00% <br /> *Sediment capacity based on Average Annual R of 16.6 for 3 year(s) <br /> Straight Pipe <br /> Barrel Barrel Entrance Taihvater t <br /> Barrel Manning's Spillway <br /> Diameter Length Slope(%) n Elev(ft) Loss Depth <br /> (in) (ft) Coefficient (ft) <br /> 30.00 35.00 5.71 0.0240 5,626.00 0.70 1.35 <br /> Straight Pipe <br /> Barrel Barrel Entrance TaNvater <br /> Barrel Manning's Spillway <br /> Diameter Length Loss Depth <br /> Slope(%) n Elev(ft) ' <br /> (in) (ft) Coefficient (ft) <br /> 30.00 35.00 5.71 0.0240 5,626.00 0.70 1.35 <br /> Pond Results: <br /> Peak Elevation: 5,627.65 ft <br /> H'graph Detention Time: 1.74 hrs <br /> _ Pond Model: CSTRS <br /> Dewater Time: 1.17 days <br /> Trap Efficiency: 82.20% <br /> Dewatering time is calculated from peak stage to lonest spillway <br /> Elevation-Capacity-Discharge Table <br /> Filename:10 Year RPA Hyrdology and Sedimentology.sc4 Printed 09-15-2020 <br /> Blue Mountain Energy 37 Illustration 60 Addendum 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.