My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-02_HYDROLOGY - M1977208
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977208
>
2020-10-02_HYDROLOGY - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 7:58:14 AM
Creation date
10/5/2020 9:30:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Hydrology
Doc Date
10/2/2020
Doc Name
Water Monitoring - Groundwater
From
CEMEX
To
DRMS
Type & Sequence
TR12
Annual Report Year
2020
Report Quarter_Month
3
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLINE® <br /> ZZCC-MC-x OCT 0 2 zozo <br /> Buildinga better future DMSIQNOFRECLAMATION <br /> MINING AND SAFETY <br /> September 30, zozo <br /> Ms.Amy Eschberger Via FEDEX <br /> Division of Reclamation, Mining and Safety TRK #7716 778o 9925 <br /> Environmental Protection Specialist <br /> 1313 Sherman Street, Room 23.5 <br /> Denver, Colorado 80203 <br /> Re: CEMEX Lyons Mine Permit M-3-977-208 <br /> Technical Revision No. iz, Revised Groundwater Monitoring Plan <br /> Third Quarter zozo Monitoring Data <br /> Dear Ms. Eschberger: <br /> This letter transmits the surface water and groundwater data associated with the sampling of the <br /> cement kiln dust disposal area (C-Pit). This report includes data from the C-Pit ponded water and <br /> related groundwater monitoring for the third quarter of zozo, covering the reporting period from July <br /> 1, zozo to September 30, zozo. Table i presents data for the last four quarters. <br /> Groundwater samples were collected on August 25, zozo from the CEM-ooi and CEM-004 <br /> groundwater monitoring wells and from the C-Pit ponded water. The inspection of groundwater <br /> monitoring well CEM-oo5 on August 25, zozo indicated that there was not enough water volume to <br /> collect a representative sample. <br /> The samples collected from C-Pit ponded water and the groundwater monitoring wells were analyzed <br /> for pH, chloride, sulfate,total dissolved solids, selenium, and thallium.The reported pH data are based <br /> on the pH analyses performed at the time of sample collection in the field (Table 3.). The measured pH <br /> at groundwater monitoring well CEM-004 and analytical results for chloride, sulfate,total dissolved <br /> solids(TDS), selenium and thallium from the August 25, zozo groundwater sample were within the <br /> target levels prescribed by TR-iz, as shown in Table i. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.