My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-30_INSPECTION - C1980007
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980007
>
2020-09-30_INSPECTION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2020 10:39:45 AM
Creation date
9/30/2020 10:29:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
9/30/2020
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
9/24/2020
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MCC is currently mining longwall panel SS and flaring gas from the SS1-5 borehole. A fire <br />box with extinguishers and hand tools was on site. Mine staff was on site monitoring the mobile <br />flare unit. The flare is fully automated and shuts itself off when methane concentrations in the <br />gob reach 25% in order to ensure gas concentration remains well above the explosive range of 5 <br />— 15%. The flare has been running for approximately the last 48 hours at this location. Methane <br />concentrations at the mining face and open underground areas are held below the explosive range <br />through positive a pressure ventilation system. <br />All observed office, shop, parking, and storage yards were orderly and well -maintained. <br />Rules: 4.05.5 and 4.05.6: Sediment Control Measures and Sedimentation Ponds <br />Mine staff indicated that sediment control hay bales had recently been replaced in SS areas but <br />had already been destroyed by cattle. This was evident in multiple locations, although some did <br />remain intact. <br />Mine vent borehole pads have nonstructural sediment control structures consisting of native <br />brush piled along pad outslopes. No off -site sedimentation problems were noted at any pad area <br />during this inspection. <br />Rule 4.06: Topsoil <br />All observed topsoil and subsoil stockpiles were stable and marked as required. Straw wattles are <br />used for sediment control around the base of stockpiles. No problems were noted. <br />Programmatic Compliance: <br />No enforcement actions were initiated during this inspection. Cessation Order CO-2020-001 <br />remains in effect for surface activities above longwall panels SS3 and SS4. <br />2 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.