A. <br /> d) The existing drainage will remain. It presently bisects the site running from northeast to <br /> southwest. The existing wetlands areas will remain. They are located along the south <br /> side of the site and along the existing drainage. A Stormwater Management Plan was <br /> recently approved by the City that called for a stormwater quality pond and an asphalt <br /> road that will remain post reclamation. The stormwater quality pond was built per the <br /> City of Grand Junction's SWMM requirements and engineered to meet their standards <br /> for WQCV. These items will remain post-reclamation. <br /> e) The City of Grand Junction- Public Works has received approval to store various <br /> construction materials and to stage clean-up operations at this location. There will be <br /> an east and west detention pond, a pond outlet structure for each, berms funneling <br /> stormwater into the ponds, and the access road with 6" of asphalt road base. These <br /> items will remain post-reclamation. SWMM water quality requirements will be achieved <br /> through the installation of the berms, the resultant ponds which they create, and the <br /> proposed outlet works for the ponds. Both ponds (West Pond & East Pond) discharge <br /> into the Unnamed Creek. In turn the Unnamed Creek discharges to the Gunnison <br /> River approximately 1,200 feet downstream of the property boundary. <br /> 2. This application is not for a Limited Impact application and does not need to provide <br /> an estimate of actual costs to reclaim the site since the Operator of this site is the City <br /> of Grand Junction. There is no bond required for this site pursuant to C.R.S. 34-32.5- <br /> 110(6) since the operator is the City of Grand Junction. <br />