Laserfiche WebLink
April21, 2020 <br />Page 13 <br />• Minor tension cracks are anticipated to develop along the bench crests during and after <br />construction. Such cracks should be regraded to cut off water ingress into the tension <br />cracks, thus limiting their progressive downward extension. Dumping should be suspended <br />if tension cracks greater than 6 inches wide and 2 ft deep develop. <br />• Dumping operations should be suspended and the operational strategy reconsidered if <br />displacements of greater than I ft/day are noted anywhere along the crest of the newly <br />deposited spoil zones. <br />Agapito Associates, Inc. <br />