Laserfiche WebLink
Stage, Feet <br />16 <br />14 <br />13 <br />12 <br />11 <br />10 <br />e <br />a <br />7 <br />6 <br />6 <br />4 <br />3 <br />2 <br />1 <br />0 <br />M <br />RELATIVE ELEVATIONS ARE MEASURED <br />FROM THE UPSTREAM TOE OF DAM <br />Deacon Pond 1 Embankment <br />Width of Embankment <br />Typ. 15' Top of Dam Elevation 6,830' <br />lSpillway Invert Elevation 6,825' <br />3 <br />CORE <br />1 <br />C.L. <br />Spillway Configuration <br />Erosion Control <br />Material <br />Top of Dam Principal Spillway <br />Elevation 6,830' Invert Elevation 6,825' <br />2 <br />LEGEND <br />SCALE <br />0 10' 20' <br />ment Capacity Elevation 6,822.61' <br />Toe <br />Stage Storage Curve <br />Scale 1:5 <br />SedlmeM CepecNy. 4 71 ec-1L <br />1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 <br />Stage Height in Ft. <br />TRAPPER MINING INC. <br />TRAPPER MINE CRAIG, CO. <br />Deacon Pond 1 E1 1aFl1-1 1 -- <br />Spillway Confkjura#m-- <br />Stage Storage• - <br />SCALE: V =10' <br />DESIGNED BY: TSP <br />DRAWN BY: TSP <br />DATE: 4!3M7 <br />