My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-21_REVISION - M2017035 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2017035
>
2020-09-21_REVISION - M2017035 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 7:56:21 AM
Creation date
9/22/2020 1:58:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017035
IBM Index Class Name
Revision
Doc Date
9/21/2020
Doc Name
Adequacy Review
From
DRMS
To
Miners Mall, LLC
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M-2017-035 AM-1 <br /> September 21, 2020 <br /> Page 2 <br /> Exhibit C <br /> 7. Pursuant to Rule 6.3.3(1)(i),Will ground water be encountered at any of the project areas? <br /> 8. During a previous inspection the use of Dexpan or Eco-Blast as an alternative to conventional <br /> explosives was mentioned. Moving forward with the project will either of these materials be <br /> used? <br /> 9. What disturbances will the support areas include?A flat pad being erected? <br /> 10. Will any ventilation shafts or additional portals/adits beyond what is historically present be <br /> constructed? <br /> 11. Siberia Project Area - Please state how the portal will be safeguarded when not actively <br /> working in it. <br /> 12. Midway Project Area- <br /> a. The creation of additional trails is mentioned. Describe the average width and <br /> anticipated length of trails to be constructed. <br /> b. Pursuant to Rule 6.3.3(1)(d),What is the anticipated depth and/or volume of tailings <br /> material to be sorted (i.e. mined). <br /> c. Per Rule 6.3.3(1)(0, The dimension of the tailings pile to be mined and the sorted <br /> material storage if different than the mined areas. <br /> 13. Connector Project Area- <br /> a. Are the limitations of mining just picking through fallen rocks and slope stabilization? <br /> Will any actual excavations be made? <br /> b. Per Rule 6.3.3(1)(0, What is the dimensions of the area to be worked under this <br /> phase? <br /> c. Applications of limited amounts of topsoil is mentioned. What is the source of this <br /> topsoil?Will any soil be stockpiled from this project area, if so describe. <br /> 14. Purple Pipe Area- <br /> a. Describe the methodology of mining in more detail for this phase (rock picking, <br /> stripping surface,underground portal,etc.). <br /> b. Pursuant to Rule 6.3.3(1)(c),What is the anticipated depth of overburden. <br /> c. Per Rule 6.3.3(1)(d),What is the anticipated depth of material to be mined. <br /> d. Per Rule 6.3.3(1) (0, The dimension of this area to be mined and the waste rock <br /> storage pile if different than the mined areas. <br /> 15. Yet Unnamed Project Area - Provide details of the anticipated operation pursuant to Rule <br /> 6.3.3(1). Can be described in general terms with a commitment to submit Technical Revision <br /> and gain approval prior to commencement of this phase. <br /> Exhibit D <br /> 16. At what point will mining conclude and reclamation commence? <br /> 17. Provide a short summary of the reclamation measures to take place at each project area given <br /> that mining methodologies vary based on project area. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.