Laserfiche WebLink
M-2017-035 AM-1 <br /> September 21, 2020 <br /> Page 2 <br /> Exhibit C <br /> 7. Pursuant to Rule 6.3.3(1)(i),Will ground water be encountered at any of the project areas? <br /> 8. During a previous inspection the use of Dexpan or Eco-Blast as an alternative to conventional <br /> explosives was mentioned. Moving forward with the project will either of these materials be <br /> used? <br /> 9. What disturbances will the support areas include?A flat pad being erected? <br /> 10. Will any ventilation shafts or additional portals/adits beyond what is historically present be <br /> constructed? <br /> 11. Siberia Project Area - Please state how the portal will be safeguarded when not actively <br /> working in it. <br /> 12. Midway Project Area- <br /> a. The creation of additional trails is mentioned. Describe the average width and <br /> anticipated length of trails to be constructed. <br /> b. Pursuant to Rule 6.3.3(1)(d),What is the anticipated depth and/or volume of tailings <br /> material to be sorted (i.e. mined). <br /> c. Per Rule 6.3.3(1)(0, The dimension of the tailings pile to be mined and the sorted <br /> material storage if different than the mined areas. <br /> 13. Connector Project Area- <br /> a. Are the limitations of mining just picking through fallen rocks and slope stabilization? <br /> Will any actual excavations be made? <br /> b. Per Rule 6.3.3(1)(0, What is the dimensions of the area to be worked under this <br /> phase? <br /> c. Applications of limited amounts of topsoil is mentioned. What is the source of this <br /> topsoil?Will any soil be stockpiled from this project area, if so describe. <br /> 14. Purple Pipe Area- <br /> a. Describe the methodology of mining in more detail for this phase (rock picking, <br /> stripping surface,underground portal,etc.). <br /> b. Pursuant to Rule 6.3.3(1)(c),What is the anticipated depth of overburden. <br /> c. Per Rule 6.3.3(1)(d),What is the anticipated depth of material to be mined. <br /> d. Per Rule 6.3.3(1) (0, The dimension of this area to be mined and the waste rock <br /> storage pile if different than the mined areas. <br /> 15. Yet Unnamed Project Area - Provide details of the anticipated operation pursuant to Rule <br /> 6.3.3(1). Can be described in general terms with a commitment to submit Technical Revision <br /> and gain approval prior to commencement of this phase. <br /> Exhibit D <br /> 16. At what point will mining conclude and reclamation commence? <br /> 17. Provide a short summary of the reclamation measures to take place at each project area given <br /> that mining methodologies vary based on project area. <br /> Page 2 of 5 <br />