Laserfiche WebLink
Grand function <br /> C O L O R A D O <br /> COMMUNITY <br /> DEVELOPMENT <br /> Trent Prall May 29, 2020 <br /> City of Grand Junction <br /> Public Works Department <br /> 518 28 Road <br /> Grand Junction, Colorado 81501 <br /> RE: SPT-2020-35 Public Works Materials Storage and Transfer <br /> Dear Trent, <br /> Attached you will find a Decision Letter for the project referenced above. The letter <br /> states the project has met Zoning and Development Code requirements but please note <br /> the items below that must be satisfied prior to construction on the site. <br /> Once these items have been satisfied, the approval will be considered finalized, a <br /> Planning Clearance issued and construction may commence. In the meantime, <br /> materials may be stored on the site and fencing may be installed for security measures. <br /> Please do not hesitate to contact me if you have questions about this information or <br /> about the Decision Letter. <br /> Sincerely, <br /> Kristen Ashbeck AICP <br /> Principal Planner <br /> PLAN SIGNATURE AND PLANNING CLEARANCE <br /> 1. Revise plans per final comments from City Development Engineer and Mesa <br /> County Stormwater attached. <br /> 2. Obtain a Construction Stormwater Permit from Mesa County Engineering. <br /> 3. Submit one hard copy of full plan set for City signatures. Further instructions <br /> upon plans being signed. <br /> 250 North 5tn Street,Grand Junction,CO 81501-2628 P(970)244-1430 F(970)256-4031 ww.gjcity.org <br />