My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-21_REVISION - C1981044 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2020-09-21_REVISION - C1981044 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 4:39:51 PM
Creation date
9/21/2020 3:55:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
9/21/2020
Doc Name Note
Application Revised Pages - List of Exhibits
Doc Name
Proposed Revision Materials
From
Peabody - Moffat County Mining, LLC
To
DRMS
Type & Sequence
TR38
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.28 COAL PROCESSING PLANTS AND SUPPORT FACILITIES NOT LOCATED AT OR NEAR THE MINE <br />SITE OR NOT WITHIN THE PERMIT AREA FOR THE MINE <br />As noted in Section 2.05.3, Operation Plan - Permit Area, all active coal handling and support facilities related to the Eagle <br />Mines will be located within the planned pen -nit area. The location of these facilities is shown on the Structures and <br />Renewable Resources Map (Map 25). Since no coal handling or support facilities associated with the RAG EC operations <br />will be located outside the permit boundaries, this section is not applicable. <br />4.29 IN SITU PROCESSING <br />RAG EC has no plans to conduct any in situ mining or processing in conjunction with the mining operations. Therefore, this <br />section of the performance standards is not applicable. <br />4.30 CESSATION OF OPERATIONS <br />Rio =IaLIW117_1.I•1 <br />RAG EC has notified the DMG as the operation is in temporary cessation. The notice of temporary cessation included a <br />statement of the exact number of acres, which have been disturbed prior to cessation, the extent and nature of reclamation <br />activities, which have been completed on disturbed areas prior to cessation, identification of backfilling, regrading, <br />revegetation, environmental monitoring, and water treatment activities, which will continue during the period of cessation, <br />and a description of the circumstances resulting in the decision to temporarily cease mining operations, and if known, the <br />date when it is anticipated that mining and related operations will resume. In the event that it becomes necessary to <br />temporarily cease mining and reclamation operations, RAG EC will continue to support and maintain all existing mine - <br />related facilities during the period of cessation. <br />4.30.2 PERMANENT <br />Upon the completion of all mining activities, or if due to unforeseen circumstances, it becomes necessary to permanently <br />cease mining and related operations, RAG EC will close, backfill, and otherwise permanently reclaim all areas disturbed by <br />the mining and related operations in accordance with the reclamation plan presented in Section 2.05.5, Reclamation Plan. <br />Upon permanent cessation of the mining and reclamation operations, RAG EC will remove all equipment, structures, and <br />other facilities and will reclaim any related disturbed areas. Only the main access road and old Highway 13 as discussed in <br />Section 2.04, Reclamation Plan, and Ponds 9A-PI, 9A-P2, 9A-P3 and 9A-P4 will remain upon completion of final <br />reclamation. The multi -Services building at the 5A portal will also remain as a permanent feature to support the postmining <br />land use as an agricultural storage building. D <br />TR20-38 4.01-15 Revised 09/15/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.