Laserfiche WebLink
intervals. The ditches will be maintained until the vegetation becomes established. It is anticipated that the ditches <br />would fill with sediment in the initial years following vegetation establishment. On completion of backfilling and <br />grading operations, the salvaged plant growth media will be redistributed over the area.. The postmining topography of <br />the area is shown on the Reclamation Plan Map (Map 29). <br />The regraded areas will be planted with a cover crop and subsequently drill -seeded with the appropriate seed mixture <br />(rangeland/wildlife for sloping areas and pastureland for flatter areas). The seed will be applied with a rangeland drill <br />at the rate of 17.25 pounds PLS/acre for the rangeland/wildlife mixture and 17.0 pounds PLS acre for the pastureland <br />mixture. Where it is necessary to broadcast the seed, the seeding rate will be doubled. <br />No. 9 Mine Portal Area and 7-North Angle Well <br />As previously discussed in Section 2.05.3, Operation Plan - Permit Area, an additional coal refuse disposal site was <br />established in the No. 9 Mine Portal Area. Prior to establishment of the refuse disposal area, electrical equipment, <br />surface coal haulage equipment (conveyor belt system), ventilation equipment, and miscellaneous mining scrap located <br />in the portal excavation were dismantled and removed from the site, the portal entries, located at the bottom of the portal <br />excavation were sealed and covered with 15 feet of material, and all exposed coal seams were covered with a minimum <br />of four feet of inert backfill material. In conjunction with coal refuse placement activities, a monitoring well was <br />established adjacent to the coal refuse disposal area. The well is monitored on a quarterly basis, consistent with schedule <br />and parameters outlined in Exhibit 29. <br />Once the initial backfilling was completed, waste material including coarse reject was hauled to the refuse area and <br />placed and compacted in 2-foot lifts. Placement continued until the refuse reached a level four feet below the planned <br />reclaimed surface. In 2008, as part of a larger site reclamation project, the No. 9 Portal Warehouse Building was <br />demolished, a solid waste disposal site was permitted and established in the portal backfill area, and the remainder of <br />the portal excavation and refuse area were backfilled and covered with a minimum of four feet of suitable material using <br />materials stockpiled from the original portal excavation. The reclaimed areas were then graded to blend with the <br />surrounding terrain and to reestablish effective drainage consistent with the design postmining topography (Refer to the <br />Reclamation Plan Map, Map 29). The regraded surface was left in a roughened condition to minimize slippage and <br />promote root growth and moisture infiltration. Soil material, which was temporarily stored adjacent to the No. 9 Portal <br />Area, was redistributed over the regraded area to a depth of approximately 6 inches. <br />The No. 9 Dewatering Installation below old County Road 13 (7-North Angle Well) will be reclaimed when it is no <br />longer needed to support ongoing or anticipated future operations. Reclamation will include powerline removal, <br />building and facilities removal, and plugging and sealing of the dewatering borehole, consistent with applicable State <br />Engineer requirements. On completion of facilities removal, the facilities area will be regraded. The culverts will be <br />removed, and the ditch along the side of the road will be maintained until the 5A Portal Area is reclaimed. The entire <br />area, with the exception of the No. 9 Dewatering Installation, will be returned to a postmining land use of cropland or <br />pastureland. The No. 9 Dewatering Installation will be returned to a postmining land use of pastureland. The reclaimed <br />areas either have been or will be reseeded with a cover crop and the appropriate reclamation seed mixture using a <br />rangeland seed drill. Where necessary to apply the seed by the broadcast method, the seeding rates are doubled. It is <br />anticipated that the area to be planted to cropland will be seeded with a cereal grain, most likely Winter Wheat, at the <br />rate of 60 pounds/acre. <br />No. 9 Coal Refuse DisDOsal Area <br />Reclamation of the approved refuse disposal area has been an ongoing process, with reclamation of portions of the area <br />as those areas are filled to the final design elevation. <br />Given the sloping topography of the refuse disposal area, initial pile construction began at its southern limits, with the <br />initial lifts progressing to the north until the pile surface is level. Once the pile was level, construction was generally <br />from north to south. Lift thicknesses was about 24 inches and each lift was compacted to 90 percent of maximum dry <br />density determined by T-99 procedures. Pile construction specifications are presented in Exhibit 21, Waste Disposal <br />Site. <br />TR20-38 2.05-29 Revised 09/15/20 <br />