Laserfiche WebLink
8. Emergency Spillway (See Table 1, Spillway Sizing Guidelines) <br />Bottom Width (ft) Side Slopes: Freeboard (ft)' Location relative to embankment (facing <br />(Horizontal : 1 Vertical) downstream) <br />3 2:1 J 1.5 O Left O Right 0 No Spillway <br />Freeboard means the vertical dimension between the crest (or invert) of the emergency spillway and the crest of the dam, the <br />minimum is 3 feet. <br />9. Outlet Conduit <br />Material Type I PVC <br />Diameter (inches) <br />611 <br />For Livestock Water Tanks <br />Can all water be drained through a gated or ungated outlet? 0Yes (�) No <br />For Erosion Control hams <br />Can water be drained through an ungated outlet leaving no more than 2 acre-feet in storage? 0 Yes 0 No <br />10. Dam Status <br />Proposed <br />(Existing' If existing, when was construction completed? 1979 <br />'These dams may be subject to modification, alteration, repair, or breach consistent with the authority of the State <br />Engineer. <br />11. Sign and Enter Name of Responsible Individual or Authorized Agent <br />• Construction must reasonably comply with the attached standard plans and specifications and the claims made in this <br />application. Dam designs completed by a Professional Engineer and submitted with the application may be accepted as <br />an alternative to the standards. If the State Engineer finds that the construction fails to conform with the application <br />and standards, it is the duty of the owner to make changes the State Engineer determines are necessary. <br />• The making of false statements herein constitutes perjury in the second degree, which is punishable as a class t <br />misdemeanor pursuant to C.R.S. 24-4-104 (13)(a). I have read the statements herein, know the contents thereof and <br />state that they are true to my knowledge. <br />Sign or Enter Name(s) of Responsible Individual(s) or Authorized Agent Date <br />08/05/2020 <br />If Signing Enter Name and Title <br />Miranda Kawcak, Environmental Manager <br />DRS-11: Application for Livestock Water Tank and Erosion Control Dam - Page 3 of 3 <br />