Laserfiche WebLink
P.O. Box 187 <br />September 15, 2020 <br />TRAPPER MINING INC. <br />Craig, Colorado 81626 <br />Ms. Robin Reilley <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Dear Ms. Reilley: <br />Re: Trapper Mining Inc., Permit No. C-1981-010 <br />Phase I Bond Release Application (SL-22) <br />(970)824-4401 <br />Trapper has elected to defer the inspection of this bond release block beyond the regulatory <br />requirement deadline of October 9, 2020. This deferral is to allow a second bond release <br />inspection for SL21 to occur at the same time as this one to reduce travel requirements of the <br />interested parties. The inspection is scheduled for October 13, 2020. <br />Please contact me if you have any questions regarding this correspondence. <br />Sincerely, <br />Graham Roberts <br />Environmental Engineer <br />GCR/[Bond Release/SL-22/SL-22 Inspection Deferral.doc] <br />Encl <br />c File 109.2.3.3 <br />SL-22 notebook <br />