My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-15_PERMIT FILE - M2020028
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020028
>
2020-09-15_PERMIT FILE - M2020028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 11:22:30 AM
Creation date
9/15/2020 8:01:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020028
IBM Index Class Name
Permit File
Doc Date
9/15/2020
Doc Name Note
Receipt #33123, M-2020-042
Doc Name
Application
From
FMIC
To
DRMS
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - Mining Plan <br />Rule 6.3.3 <br />The purpose of the mining plan is to describe how mining will affect the permit area for the duration of <br />the operation. <br />1) Estimated dates of commencement: 9-1 ' Zd and completion: <br />Note: Reclamation of all affected lands shall be completed within 12 months after issuance of the <br />permit. An Operator possessing a 111(1)(b) Reclamation Permit must convert to the appropriate <br />regular construction materials permit if extraction and export of materials from the site are not <br />completed within 12 months after the issuance of the permit. <br />2) Depth of topsoil to be salvaged (check one): <br />r_ 4-6 inches __a_6-8 inches <br />rl 8-10 inches _O_l0-12 inches <br />n Other: <br />5_ N/A, explain: Sit. sanl�ebw "VP rr.,,,,L41 h?to °� rrx�otr <br />3) Description of how topsoil will be stockpiled and stabilized: <br />4) Thickness of overburden needed to be moved: feet or Y_ N/A <br />5) Thickness of deposit to be mined: -7 tel- feet <br />6) How will the mine be accessed: (_& existing roads dD) new roads will be created <br />a. Please describe the existing roads: Gdbd� <br />_ r�ser�o�r t�otd�tdd 1X' 14hen <br />-b msa*mw5k. <br />b. if there will be new roads or road improvements, please describe the new roads and road <br />improvements (note, new roads must be included in permitted acreage): <br />'n Will water be needed during the mining operation (check one): (ja Yes or (E) No <br />a. If yes, please describe the source of the water and how much water will be used during the <br />operation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.