My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-10_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2020-09-10_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 12:40:50 PM
Creation date
9/11/2020 11:33:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
9/10/2020
Doc Name
Adequacy Review #2
From
Colowyo Coal Company LP
To
DRMS
Type & Sequence
TR140
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Regrade East Taylor French Drain Topsoil <br />Site: Colowyo Coal Mine Permit Action: TR140 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 9/10/2020 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Abbreviation: None <br />Filename: CO 19-002 <br />$116.22 <br />Utilization % <br />NA <br />$89.77 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.30 <br />NA <br />Total unit Cost/Hour: $247.28 <br />Total Fleet Cost/Hour: $247.28 <br />MATERIAL OUANTITIES <br />Initial Volume: 363 <br />Swell factor: 1.000 <br />Loose volume: 363 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Exhibit 13B -T-21, Table 8 <br />Cat Handbook <br />50 feet <br />1,400.0 LCY/hr <br />Compacted fill or embankment 0.9 <br />Average push 5% <br />gradient: <br />Average site altitude: 7,500 feet <br />Material weight: 1,600 lbs/LCY <br />Weight description: Top Soil <br />
The URL can be used to link to this page
Your browser does not support the video tag.