My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-10_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2020-09-10_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 12:40:50 PM
Creation date
9/11/2020 11:33:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
9/10/2020
Doc Name
Adequacy Review #2
From
Colowyo Coal Company LP
To
DRMS
Type & Sequence
TR140
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclaim East Taylor French Drain <br />Site: Colowyo Coal Mine Permit Action: TR140 <br />PROJECT IDENTIFICATION <br />Task 4: 000 <br />Date: 8/27/2020 <br />User: ZTT <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Perinit/Job#: C1981019 <br />Abbreviation: None <br />Filename: CO 19-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />Demo East Taylor French Drain <br />DEMOLISH <br />1 <br />1 <br />8.00 <br />$1,982 <br />$110 <br />Re rade East Taylor French Drain Topsoil <br />DOZER <br />0.45 <br />L_ SUBTOTALS: <br />8.45 <br />$2,092 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Total = <br />$42 <br />Performance bond: 1.05 <br />Total = <br />$22 <br />Job superintendent: 4.22 <br />Total = <br />$294 <br />Profit: 10.00 <br />Total = <br />$209 <br />TOTAL O & P = <br />$567 <br />CONTRACT AMOUNT (direct + O & P) — <br />$2,659 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />$0 Total — <br />$0 <br />Engineering work and/or contract/bid preparation: <br />2.00 Total — <br />$53 <br />Reclamation management and/or administration: <br />1.91 <br />$51 <br />CONTINGENCY: <br />0.00 Total — <br />$0 <br />TOTAL INDIRECT COST = <br />$671 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$2,763 <br />
The URL can be used to link to this page
Your browser does not support the video tag.