Laserfiche WebLink
�•C <br /> COLORADO DIVISION OF RECLAMATION,MINING AND SAFETY <br /> 1876 1313 Sherman Street,Room 215,Denver,Colorado 80203 Phone(303)866-3567 <br /> Rrmcraulnn <br /> TEMPORARY CESSATION NOTICE SEP Q 8 2020 <br /> (mining activities temporarily cease for more than a one-year period) <br /> Today's date:02 September 2020 DIVISION OF RECLAMATIONMINING AND SAFETY <br /> Permit number: M- 1980-055HR Site name:Topaz Mine <br /> County:San Miguel County TC number: (DRMS use only) <br /> Permittee making request:Mike Rutter <br /> Operator(if other than permittee):Pinon Ridge Mining LLC <br /> Date the initial five-year period of Temporary Cessation begins: February 26 2020 <br /> Reason mining activities(materials extraction,processing,hauling)have ceased: <br /> PRM has mada the decision to halt operations, due to tha COVID-19 nandamic_ <br /> Description of plan to resume operations: <br /> As soon as the COVID-19 pandemic is under control, and the economy has recovered to some extent, PRM <br /> plans to continue mining,as wail as uranium and/or vanadium prices allow for economic operations. <br /> Description of plan to meet performance standards of Rule 3.1 during temporary cessation(reclamation,weed control, <br /> monitoring,signs,markers, etc.): <br /> PRM will inspect and maintain the SMC during tem ora closure in accordance with its DRMS permots and the <br /> BLM interim management plan that is provided in section 7 of the proposed SMC POO. <br /> Number of affected acres:30.00 <br /> Amount of financial warranty(bond)on deposit with the state: $99 893_DO <br /> Required fees for Temporary Cessation by permit type(please mark the correct fee and submit it with this request <br /> for Temporary Cessation): <br /> Permit type Required TR fee Submitted(mark only one) <br /> Construction Materials $144 El <br /> Hard Rock/Metal Mining $115 a <br /> The above-referenced permit ha entered Temporary Cessation. This site has reserves remaining to be mined. <br /> Operator's signature: <br /> Please note: <br /> 1. While in Temporary Cessation, the operator must continue to comply with the Rules and Act, including <br /> maintaining the site, and must continue to file an annual report and annual fee. <br />