Laserfiche WebLink
�•CO 4c-q <br /> 7 <br /> COLORADO DIVISION OF RECLAMATION, MINING AND S <br /> 1313 Sherman Street,Room 215,Denver,Colorado 80203 Phone(303)86 C&j <br /> SEP o s �a2o <br /> TEMPORARY CESSATION NOTICE <br /> (mining activities temporarily cease for more than a one-year period)DMS10N Of RECLAMTION <br /> MINING AND SAFETY <br /> Today's date:02 September 2020 <br /> Permit number: M- 19a1-o21 Site name:West Sunday Mine <br /> County:San Miguel County TC number: (DRMS use onW <br /> Permittee making request:Mike Rutter <br /> Operator(if other than permittee):Pinon Ridge Mining _LC <br /> Date the initial five-year period of Temporary Cessation begins: Fe_ bn,ary 26,2020 <br /> Reason mining activities(materials extraction,processing,hauling)have ceased: <br /> PRM has made the dacininn to halt nneratinns, dua to tha C:OVID-19 pandamic <br /> Description of plan to resume operations: <br /> As anon as the COVID-19 pandemic is ender control, and the economy has recovered to some extent PRM <br /> plans to continua mining,as wall as uranium and/or vanadium prices allow for economic operations. <br /> Description of plan to meet performance standards of Rule 3.1 during temporary cessation(reclamation,weed control, <br /> monitoring, signs,markers,etc.): <br /> PRM will inspect and maintain the SMC during temporary closure in accordance with its DRMS permits and the <br /> Rl M interim management plan that is provided in section 7 of the prcmosed SMC POO. <br /> Number of affected acres:20.00 <br /> Amount of financial warranty(bond)on deposit with the state: $85,o36_0o <br /> Required fees for Temporary Cessation by permit type(please mark the correct fee and submit it with this request <br /> for Temporary Cessation): <br /> Permit type Required TR fee Submitted(mark only one) <br /> Construction Materials $144 <br /> Hard Rock/Metal Mining $115 <br /> The above-referenced permit has entered TemporaryCessation. This site has reserves remaining to be mined. <br /> Operator's signature: <br /> Please mote: <br /> 1. While in Temporary Cessation, the operator must continue to comply with the Rules and Act, including <br /> maintaining the site, and must continue to file an annual report and annual fee. <br />