Laserfiche WebLink
A summary of the CEC acreages disturbed, those already reclaimed, and acreage remaining to be <br />reclaimed is presented below. This information includes the revised acreages: <br />Disturbed areas to be reclaimed (approximate acreages): <br />B -Pit local areas [A -Pit is closed] 26.39 acres <br />Long-term spoil area 38.22 acres <br />Topsand piles A-1, A-3, B-1 and B-2' 16.42 acres <br />Sediment Pond 2 & other non -reclaimed areas 21.18 acres <br />Total area remaining to be reclaimed 102.21 acres <br />Total area reclaimed and revegetated 123.34 acres <br />Grand Total 225.55 acres <br />Also, the following information provides a summary soil balance of both the overburden soils <br />and topsand volumes: <br />OVERBURDEN SOILS <br />Quantities Required <br />B -Pit (intermediate cover) 347,242 BCY <br />Stockpiled Quantity <br />Long-term spoil area <br />Total Remaining <br />272,966 BCY <br />347,242 BCY -from above <br />-74,276 BCY <br />1 Topsand pile B-2 has been incorporated within pile A-3 for reference and mapping purposes. <br />114a 06/16 <br />