Laserfiche WebLink
over the top of the concrete plug will be the same as the amount of material removed during <br /> shaft construction. The backfilled material will be blended in to match the local topography <br /> with a minimum of 6 inches of topsoil or native materials placed on top of the backfilled areas. <br /> The sources of this material will be soil or other native materials (e.g., rock) generated during <br /> shaft construction. The Monogahela Shaft is located in a previously disturbed area and will be <br /> reclaimed using materials excavated from the site to blend with the existing landscape. <br /> 3.3 Dismantle Buildings and Structures at Portal Area <br /> Reclamation will include the removal of certain buildings and other structures.The following <br /> structures will be removed at the Revenue Portal area: <br /> • Diesel storage and filling station <br /> • Propane storage A <br /> • Propane storage B <br /> • Propane storage C <br /> • Ventilation Fan <br /> • Underground warehouse and shop <br /> • Waste storage pad and secondary containment <br /> • Tailing thickener tank <br /> • Materials storage Connex <br /> • Crusher and retaining wall <br /> The facilities generally have either 6 or 12-inch concrete foundations. As shown on Map F-1 <br /> and Map F-la, various structures will remain as part of the post-mine land use. <br /> A list of buildings/structures that will remain on site is provided in Table L-2. Buildings <br /> also are shown on Map F-1 and Map F-la. <br /> 3.4 Portal Areas <br /> There are three portal areas that will be reclaimed:the underground storage room,the mill, and <br /> the Revenue tunnel portal. The reclamation of each portal will proceed in the following <br /> Exhibit E Reclamation Plan E-4 <br /> Technical Revision 11 <br /> September 2020 <br />