My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-08_REVISION - M2012032 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2020-09-08_REVISION - M2012032 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 4:11:03 AM
Creation date
9/8/2020 9:31:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
9/8/2020
Doc Name
Adequacy Review Response
From
Ouray Silver Mines
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/unit Fleet Size Haul Trip Cost/hr/ Return Trip <br /> fleet Cost/hr/fleet <br /> Power Mulcher(Remco M90) $25.56 1 $25 56 $25 56 <br /> Flatbed 45 GVW 6x4 $55.61 1 $55 61 $55 61 <br /> Subtotals: 1 $81.17 $81.17 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region MONTROSE <br /> Total one-way travel distance 45.00 miles <br /> Average Travel Speed 35.00 mph <br /> Total Non-Roadable Mob/Demob Cost" <br /> $4,423.73 <br /> two round tnps with haul ng* <br /> Total Roadable Mob/Demob Cost* $208 72 <br /> **one round trip,no haul ng* <br /> Non-Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours). 129 1.29 <br /> Return Time(Hours): 129 1.29 <br /> Loading Time(Hours). 050 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals:1 3.57 2.57 \[_ <br /> JOB TIME AND COST <br /> Total job time: 6.14 Hours <br /> Total job cost: $4,632 <br />
The URL can be used to link to this page
Your browser does not support the video tag.