Laserfiche WebLink
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/unit Fleet Size Haul Trip Cost/hr/ Return Trip <br /> fleet Cost/hr/fleet <br /> Power Mulcher(Remco M90) $25.56 1 $25 56 $25 56 <br /> Flatbed 45 GVW 6x4 $55.61 1 $55 61 $55 61 <br /> Subtotals: 1 $81.17 $81.17 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region MONTROSE <br /> Total one-way travel distance 45.00 miles <br /> Average Travel Speed 35.00 mph <br /> Total Non-Roadable Mob/Demob Cost" <br /> $4,423.73 <br /> two round tnps with haul ng* <br /> Total Roadable Mob/Demob Cost* $208 72 <br /> **one round trip,no haul ng* <br /> Non-Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours). 129 1.29 <br /> Return Time(Hours): 129 1.29 <br /> Loading Time(Hours). 050 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals:1 3.57 2.57 \[_ <br /> JOB TIME AND COST <br /> Total job time: 6.14 Hours <br /> Total job cost: $4,632 <br />