Laserfiche WebLink
BULLDOZER WORK <br /> Task description: Spread topsoil <br /> Site: Revenue Mine Permit Action: TR-011 <br /> Permit/Job#: M-2012-032 <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> �ost Breakdown: <br /> HOURLY EQUIPMENT COST <br /> Utilization% <br /> Ownership Cost/Hour: $100.59 NA <br /> Operating Cost/Hour: $87.23 100 <br /> Ripper own.Cost/Hour: $0.00 NA <br /> Ripper op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.85 NA <br /> Total unit Cost/Hour: $229.67 <br /> Total Fleet Cost/Hour: $229.67 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 4,001 <br /> Swell factor: 1.125 <br /> Loose volume: 4,501 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br />