Laserfiche WebLink
Ouray Silver Mines Inc Table L-2 <br /> Technical Revision 11 <br /> Table L-2: Building List with Proposed Cost <br /> TRI1 Previous TRI1 <br /> # Structure Construction Foundation Permanent Post Mine Use Changes Reclamation Reclamation <br /> Cost Cost <br /> 1 Diesel Storage&Filling Station Steel tank on skids None No None None $500 $500 <br /> 2 Administration Building 2 Story 6"concrete slab w/rebar Yes,remove Storage None $3,600 $3,600 <br /> certain inside items <br /> 3 Air Compressor Budding Yes,remove inside None None N/A $2,000 <br /> equipment <br /> 4,5, Propane Tanks(A,B,&C) Tanks covered with None No None None $1,500 $1,500 <br /> 15 3 sheds <br /> 6 Ventilation Fan No None None N/A $500 <br /> 7 Rail Yard&Battery Charging 45'x 120'metal 6"concrete slab Yes,remove inside Storage None $1,400 $1,400 <br /> siding with track equipment <br /> 8 Underground Warehouse and Shop No None None N/A $500 <br /> 10 Electrical Center 25'x 30' Partial concrete slab Yes Electrical Use None $0 $0 <br /> 11 Backup Generator Yes Electrical Use None $0 $0 <br /> 12 Concentrator&Filter Budding 2 Story 6"concrete 12"concrete slab w/ Yes,remove inside Storage None $8,000 $8,000 <br /> walls rebar equipment <br /> 13 Waste Storage Pad&Secondary Concrete pad sided 6"concrete slab and No None Added to N/A $4,000 <br /> Containment by 2 connex and budding demo and List <br /> corrugated metal disposal <br /> siding <br /> 14 Tailings Thickener Tank 28'diameter x 8' 1692 sq ft foundation No None None $5,000 $5,000 <br /> high steel structure plus 4'high walls with <br /> on steel beams footers for beam support <br /> 16 Materials Storage Connex* Connex None No None None N/A $506 <br /> 17 Septic Tanks N/A N/A Yes None None $0 $0 <br /> 18 Access Road Retaining Wall 100'long gabions None Yes Site Access None $0 $0 <br /> 19 Crusher&Retaining Wall 28'lon x 16'hi h Wood and steel beams No None None $4,000 $4,000 <br /> 20 Hut at Outfall 00IA Small structure with Yes Sampling location None N/A $0 <br /> concrete pad <br /> 21 Hut at Outfall 002A(to be not yet constructed Yes Sampling location Added to N/A $0 <br /> constructed) I I I I List <br /> *note-fluid storage was moved underground and connex removed from the site <br /> Total Demolition Costs $31,500 <br /> Page 1 of 1 9/2/2020 <br />