My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-02_HYDROLOGY - M1986015
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1986015
>
2020-09-02_HYDROLOGY - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 4:08:11 AM
Creation date
9/4/2020 12:10:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
Hydrology
Doc Date
9/2/2020
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Paul Bruss, P.E. <br /> September 2, 2020 <br /> Page 6 of 6 <br /> evaporation losses and lagged depletions. If a lined pond results after reclamation, <br /> replacement of lagged depletions shall continue until there is no longer an effect on <br /> streamflow. Granting of this plan does not imply approval by this office of any such <br /> court application(s). <br /> 14. The State Engineer may revoke this SWSP or add additional restrictions to its operation <br /> if at any time the State Engineer determines that injury to other vested water rights <br /> has occurred or will occur as a result of the operation of this SWSP. Should this SWSP <br /> expire without renewal or be revoked prior to adjudication of a permanent plan for <br /> augmentation, all use of water under this SWSP must cease immediately and the <br /> Applicant shall obtain and present to this office an alternate source of replacement <br /> water. <br /> 15. In accordance with amendments to Section 25-8-202-(7), C.R.S. and "Senate Bill <br /> 89-181 Rules and Regulations" adopted on February 4, 1992, the State Engineer shall <br /> determine whether or not the substitute supply is of a quality to meet requirements of <br /> use to senior appropriators. As such, water quality data or analysis may be requested <br /> at any time to determine if the water quality is appropriate for downstream water <br /> users. <br /> 16. The decision of the State Engineer shall have no precedential or evidentiary force, <br /> shall not create any presumptions, shift the burden of proof, or serve as a defense in <br /> any pending water court case or any other legal action that may be initiated <br /> concerning this plan. This decision shall not bind the State Engineer to act in a similar <br /> manner in any other applications involving other plans, or in any proposed renewal of <br /> this plan, and shall not imply concurrence with any findings of fact or conclusions of <br /> law contained herein, or with the engineering methodologies used by the Applicant. <br /> Should you have any questions, please contact Kate Fuller of this office or Joseph Regur in the <br /> Division 2 office in Pueblo at (719) 542-3368. <br /> Sincerely, <br /> A f -D <br /> Jeff Deatherage, P.E. <br /> Water Supply Chief <br /> Attachments: Figure 1 <br /> Tables 1-5 <br /> ec: Division 2 SWSP Staff <br /> Steve Stratman, WD 14/15 Water Commissioner <br /> Doug Hollister, North Regional Team Leader <br /> Division of Reclamation, Mining, and Safety <br /> JD/kff:Transit Mix Pueblo East Pit 2020-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.