Laserfiche WebLink
C 0 L 0 R A D 0 <br /> Division of Water Resources <br /> A&I <br /> lquir Department of Natural Resources <br /> August 28, 2020 <br /> Mr. Dan Mathes, P.E. <br /> Deere Et Ault Consultants Inc. <br /> 600 S. Airport Road, Building A, Suite 205 <br /> Longmont, CO 80503 <br /> Re: Evans #2 Pit Stonewall Springs Quarry Substitute Water Supply Plan <br /> DRMS File No. M-2000-041 <br /> SE 1/4 Section 35, SW 1/4 Section 36, T20S, R63W, 6th P.M., and <br /> NW 1/4 Section 1, NE 1/4 Section 2, T21 S, R63W, 6th P.M. <br /> Water Division 21, Water District 14 <br /> SWSP ID 2709, WDI D 1407802 <br /> Approval Period: April 1, 2020 through March 31, 2021 <br /> Contact Information: (303) 651-1468; dan.mothes@deereault.com <br /> Dear Mr. Mathes: <br /> We have reviewed your February 14, 2020 letter requesting a renewal of the substitute <br /> water supply plan ("SWSP") previously approved for a sand and gravel pit owned by <br /> Stonewall Springs Quarry, LLC/Morley Companies ("SSQ" or "Applicant"). The required <br /> renewal fee of $257.00 has been received and given receipt no. 3696921. <br /> The Evans #2 Pit has been divided into separately owned areas both operating under DRMS <br /> Permit No. M-2000-041. Stonewall Springs' portion of the Evans #2 Pit (the subject of this <br /> SWSP) consists of Phase I-Parcel 4 of the mine site as shown on the attached Figure 1. <br /> Lagged depletions from previous operations at the site and from current operations at <br /> Phase I-Parcels 1-3 and Phase II-Parcel 5 are covered under a separate SWSP for the Pueblo <br /> East Pit at Evans #2 (SWSP ID 5732), submitted by Fremont Paving Et Redi-Mix, Inc. <br /> SWSP OPERATION <br /> This pit did not exist, and no groundwater was exposed, prior to January 1, 1981. This <br /> plan proposes to replace depletions to the Arkansas River that will result from <br /> remediation activities including site reclamation work and replacing depletions associated <br /> with evaporation from exposed water surface areas. Mining at the site was discontinued <br /> several years previously in the Phase 1- Phase 4 area of the mine site. Projected uses and <br /> consumption for the period of this SWSP are shown in the attached Tables 1 and 2. Up to <br /> 8.38 acre-feet will be lost through evaporation from 2.43 acres of exposed groundwater in <br /> the dewatering trench. <br /> OF C�lp <br /> 1313 Sherman t t rig:p r., Rom 821, Denver,CO 00203 P 303,866,3581 www.cotorado.govlwater <br /> Jared S, Polisz Governor I Dan Gibbs, Executive Director i Kevin G. Reim,State Engineer/Director o <br /> S/jyE"MljlA <br /> 1876 <br />