CONCRETE INC. <br />Exhibit E: Reclamation Plan <br />The property is intended to be subdivided & developed for residential homes to be built. <br />We anticipate excavating topsoil & overburden from the proposed material removal area and <br />stockpiling it on site. Stockpiles will be managed properly for stormwater management <br />requirements while excavation is occurring on the property. This material will be used in the <br />reclamation efforts after the desired material is excavated out of the area of proposed permitting. <br />Reclamation efforts are only anticipated on the Southern & Western border of the property. In <br />these areas, the land will be laid back at a 3:1 or 4:1 slope. The topsoil/overburden that was <br />stockpiled prior to excavation activities commencing will then be placed on the slopes and <br />compacted with a track mounted machine. <br />Once the slopes are "tracked -in," a third party hydro -seeding organization will be contracted to <br />hydroseed the slopes with a native grass seed. We anticipate working with our third party <br />hydroseed company and the NRCS (Natural Resources Conservation Service) to provide us a <br />study for the discovery of plant life that will flourish in the local region and seed the area with <br />whatever the study finds. <br />The Eastern & Northern boundaries of the proposed site are not anticipated to need any <br />reclamation as we will be "daylighting" the excavation on the face of the existing mesa that <br />makes up the contour of the land. The land leftover from the excavation shall be a new "bench" <br />where the subdivision homes and roads will be built. It is estimated the bench will be roughly <br />15'-20' deep. <br />Either way, the reclamation efforts will follow the material removal efforts as material is <br />excavated. As soon as a manageable area is excavated out, we will reclaim behind ourselves. <br />This should allow for about a 3/4 to 1/4 ratio. (roughly) 3/4 of what is open will be for excavation <br />and 1/4 will be reclaimed. This will allow adequate access to the dig area with machinery & <br />trucks. <br />We do not anticipate any refuse and/or acid forming/toxic producing materials in this operation. <br />We also do not anticipate importing any fill of any kind onto the property. All onsite materials <br />will be utilized for reclamation. <br />LA'N65tON <br />902 South Union Street Florence, Co. 81226 (719) 784-3878 Office (719) 784-1158 Fax <br />