Laserfiche WebLink
Report year:2014 2013 Weed Control Work: <br /> x: Halogeton,annuals,Common mullein, Houndstongue, <br /> Approved seed mi <br /> BLM standard mix 93(1997 RMP)less Yellow sweetclover. Canada thistle, Field bindweed. <br /> Treatment: Telar XP @ 1 oz./acre,Weedone(LV6 24D) <br /> Status of site for DRMS and BLM Annual Reports: @ 24 oz./acre. Surfactant/Conditioner/Dye: LI-700 @ <br /> 5 boreholes installed. Soil stockpile reseeded 03/2004. Pad 1 qt./100 gal., Hilight @ 24 oz./100 gal. <br /> downsized 0612009 and reseeded 10/2009(phase 2 interim <br /> reclamation). Pit closed. Weed control completed in 2012 Treatment method&date: Handgun @ 50 gal./acre, <br /> and 2013. Noxious weed monitoring. boom @ 25 gal.1".,re 07/01/13. <br /> We',.i and Access Road <br /> have been revegetated and <br /> weed monitoring and Topsoil Pile#3 <br /> treatment continue. =35 cu.yds. <br /> 4 cu.yds. <br /> 3'WIDE DITCH <br /> Area- 0.002 Acres <br /> •b <br /> Pad Area(including topsoil pile)=1.00 Acres <br /> 5 <br /> Topsoil Pile#1 <br /> =20 cu.yds. • <br /> 3 <br /> 2 <br /> 17 ACCESS ROAD <br /> Area■ 0.01 Aches <br /> 0 <br /> Road 6 <br /> DRMS NOI#P-2003-018 / <br /> Pad 57-15-199 Site Map <br /> (prev. Pad #B2-15) w <br /> NOTE-5 original holes included in DRMS <br /> NOI#P-2003-015. 4 holes added per 0 60 120 <br /> Permanent Photo Point _PP 1 DRMS NOI#P-2003-018. 5 holes installed <br /> to date(A,B,L5,1-41.1,L4L). Scale t- 60' <br /> County: Rio Btw=County Chuck Whiteman & Associates Shell Frontier Oil d,Gas Inc. <br /> Township: 1S R -anfle s9w P 1.1 eo1 320 3rd Street,P.O. Box 957 9h", —N Date. 06-15-2005 <br /> Section' 15 Ouww:NWSE Meeker Colorado Job No 001J6iRevise�TDG <br /> MRP-Wide Reclamation Plan -Map 120d <br /> P-2003-015 Annual Report- Map 02b <br /> P-2003-018 Annual Report-Map 04b <br /> COC65458 Annual Report-Map 02b <br />