Laserfiche WebLink
TRAPPER MINE <br />RECLAIMED PARCEL HISTORY <br />Parcel Designation: F -A-16 Acreage: 3.7 <br />Reclamation Year(s) of <br />Activity Occurrence Comments <br />Regrade <br />2016 <br />Reconstructed drainage corridor. <br />Topsoil Replacement <br />2016 <br />Depth (inches): N/A <br />How Measured: <br />Topsoil Origin: Stockpile ® Livehaul ❑ <br />Note: Topsoil laid down as practical between <br />check dams. <br />Seedbed Preparation <br />2016 <br />Dragging Disking ❑ Other X (explain) <br />Motor Grader (Blade) <br />Fertilization <br />N/A <br />Product Used: <br />Rate: <br />Seed Mixture(s) <br />2016 <br />Refer to Table(s) N/A <br />Bond Release <br />Phase I <br />Phase II <br />Phase III <br />Application # <br />SL -18 <br />Approval Date <br />7-25-19 <br />Comments: This drainage corridor was carved out of F -A-12 and 2-A-12 parcels per DRMS <br />mandate. <br />MARECLMHS <br />