Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper Push Dozer Source <br />Altitude Adj : 0.980 NA (CAT HB) <br />Job Efficiencv: 0.830 NA (CAT HB) <br />Site Altitude: 8000 feet <br />Net Correction: 0.813 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />1800.00 <br />7.50 <br />3.00 <br />10.50 <br />922 <br />1.98 <br />Haul Time: 1.98 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />1800.00 <br />-7.50 <br />3.00 <br />-4.50 <br />2972 <br />0.66 <br />Return Time: <br />0.66 <br />minutes <br />Total Scraper team cycle time: <br />4.24 <br />minutes <br />Adjusted for job conditions: <br />667.27 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />667.27 <br />LCY/Hour <br />Adjusted multiple scraper <br />team (fleet) hourly production: <br />19334.55 <br />LCY/Hour <br />Unadjusted unit production/hour: <br />820.75 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Total job time: <br />1.91 <br />Hours <br />Unit cost: $1.405 /LCY <br />Total job cost: <br />$39575 <br />