Laserfiche WebLink
Job Condition Correction Factor <br />1 Dozer(s) <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />0.900 <br />(CAT HB)) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit 354.18 LCY/hr <br />production: <br />Adjusted fleet 354.18 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: <br />1 Dozer(s) <br />Unit cost: <br />$0.965/LCY <br />Total job time: <br />31.76 Hours <br />Total job cost: <br />$10,852 <br />