My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-20_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2020-08-20_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2025 3:06:00 AM
Creation date
8/27/2020 1:35:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
8/20/2020
Doc Name Note
For RN7
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Mountain Coal Company, LLC
Permit Index Doc Type
Findings
Email Name
LDS
JDM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
622
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
build within the pile and cause the water to migrate laterally to a <br /> small seepage area at the edge of the site. There have been no <br /> visible flows from the pile toe and mid-section underdrain. <br /> ii. Mitigation of Groundwater Impacts - <br /> The applicant anticipates no degradation of groundwater quality <br /> during mining. The applicant will treat any mine water effluent <br /> as necessary to meet water quality standards prior to discharge. <br /> There will be no uncontrolled mine water discharge after mining <br /> is complete that will significantly degrade surface water or <br /> groundwater. The operation plan indicates most water used for <br /> dust control will be adsorbed on the coal and carried from the <br /> mine, thereby minimizing the quantity to be treated. Any <br /> discharge will be treated in the sedimentation ponds and <br /> discharged as specified in the NPDES permit. <br /> The required ground water monitoring plan for the West Elk <br /> Mine is described in Exhibit 71 for the South of Divide and Dry <br /> Fork lease areas, and in Table 5, Section 2.04 of the permit <br /> application for other areas. MCC monitors water quality and <br /> water levels in 27 wells in the permit area. Monitoring wells are <br /> completed in the following stratigraphic units (in ascending <br /> order): the B-seam, the E-seam, a stratigraphic interval between <br /> the E and F seams, the F-seam, the Barren Member, and <br /> Quaternary alluvium. More than one well is completed in most of <br /> the stratigraphic units. Sampling occurs seasonally(three times a <br /> year). Parameters monitored include: water level, pH, <br /> conductivity, temperature, total dissolved solids, total suspended <br /> solids, total iron, and total manganese. <br /> Underground or mine water is permitted for discharge at the <br /> following locations: Sylvester Gulch fan site, sediment pond <br /> MB-1, the Sylvester Gulch mine water treatment facility, Lone <br /> Pine Gulch and Minnesota Creek. The Lone Pine discharge has <br /> been discontinued, and the portals have been sealed. Mine water <br /> is discharged through the main portals to MB-5E and from the <br /> mine water treatment facility to Sylvester Gulch. Quality <br /> parameters appear to be such that B-seam mine water will be <br /> suitable for treatment and discharge under current NPDES/CDPS <br /> permit requirements to the North Fork of the Gunnison River. <br /> The quality of mine water from the E-seam workings can be <br /> expected to be similar to water from the B-seam workings, based <br /> on the similar depositional origin of these two seams. <br /> 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.