Laserfiche WebLink
comes out of temporary cessation, which is required for both mining and reclamation, the <br /> previous operational level monitoring would resume. Both monitoring schedules for active <br /> status and temporary cessation status are located in Table 2.04.7-T9. <br /> Upon completion of underground mining at PSCM, the following reclamation tasks will be <br /> performed on surface disturbances: portals will be sealed, structures will be demolished and <br /> transported for disposal off-site, the surface will be regraded to approximate original contour, <br /> drainage will be re-established, topsoil from the stockpile will be replaced on disturbed areas to a <br /> minimum depth of 12 inches, and seeding and shrub transplants will be performed for providing <br /> erosion control and for supporting the post mining land uses of rangeland, wildlife habitat, and <br /> recreation. <br /> 9 <br />