Laserfiche WebLink
OF cot <br /> F $ COLORADO DIVISION OF RECLAMATION MINING AND SAFETY <br /> 1313 Sherman Street, Room 215, Denver,Colorado 80203 ph(303)866-3567 <br /> *�876*' <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHPC;Rlvrww <br /> File No.: M- 2017-009 Site Name:PVRE Pit #1 AUG 2 7 1010 <br /> Log a n DwAOw oF W ' <br /> County TR# 76AWc�l>1' ' <br /> Permittee:Platte Valley Real Estate, LLC <br /> Operator(If Other than Permittee): <br /> Chamberlain Enterprises LLC, dba Chamberlain Concrete <br /> Permittee Representative: Dan E. Long <br /> Please provide a brief description of the proposed revision: <br /> Per an inspection of July 15,2020 we are sending the docments to make sure we are in compliance with the mine plan. The PVRE Pit#1 is <br /> covered under the Logan Well Users Augmentation Plan approved by the Division of Water Due to the size of the documents,I would prefer <br /> to attached them and forward them to whomever needs to review them We have enclosed the fee for the Revision along with this <br /> documnet. Chamberlains have ordered the seed for the required seeding and will probably not plant it until it cools down or otherwise the <br /> seed may not grow. Hope to have it planted prior to the October deadline if not we will contact Brock Bowles and update him on the plan. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 <br /> 110d, 112d(l, 2 or 3) $1006 ❑ <br />