Laserfiche WebLink
total ground cover of the approved technical standard. Please see Appendix B for <br />information addressing vegetation establishment and sample locations. <br />D. Sedimentology <br />In accordance with Rule 3.03.3(b), bond liability release cannot be granted until the <br />applicant demonstrates that the existing revegetated area will result in equivalent or <br />lesser sediment contributions to surface runoff when compared with pre -mining levels <br />as determined by baseline data. Please see Appendix B which documents the sediment <br />contributions for the areas being applied for Phase II release. <br />E. Rill and Gullies <br />Erosion control methods implemented for these Phase II areas have been successful <br />and the areas are stable and free of erosion. Successful revegetation efforts have <br />ensured and will continue to guarantee these areas remain free of erosion. <br />