Laserfiche WebLink
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E -Map. <br /> 1) Primary future (Post-mining) land use(check one): <br /> Cropland (CR) M Pastureland (PL) General Agriculture (GA) <br /> Rangeland(RL) F-1 Forestry (FR) Wildlife Habitat(WL) <br /> Residential (RS) _a Recreation(RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> We will fill all cuts, pits or trenches we create with larger rocks first,then a mixture of top soil and <br /> smaller rocks capping it with top soil only for future re-seeding. We are also willing to reclaim and <br /> reSPPd the old "arress" road that was used during prior mining operatinns in the past, at our rnct_ <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 2 H: I V <br /> (Note: If the Applicant proposes slopes steeper than 3H: 1 V (example 1 H:I V, 2H: 1 V, etc.),please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches �_6-8 inches <br /> 8-10 inches _F-1 10-12 inches <br /> _F-1 Other: <br /> N/A, explain: <br /> sP ara a nilP PrPraiitinnc will he used to salvage Alopsnel- <br />