My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-25_REVISION - M2017035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2017035
>
2020-08-25_REVISION - M2017035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 2:44:58 AM
Creation date
8/25/2020 9:03:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017035
IBM Index Class Name
Revision
Doc Date
8/25/2020
Doc Name
Request For Amendment To Permit
From
Miners Hall LLC
To
DRMS
Type & Sequence
AM1
Email Name
AME
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E -Map. <br /> 1) Primary future (Post-mining) land use(check one): <br /> Cropland (CR) M Pastureland (PL) General Agriculture (GA) <br /> Rangeland(RL) F-1 Forestry (FR) Wildlife Habitat(WL) <br /> Residential (RS) _a Recreation(RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> We will fill all cuts, pits or trenches we create with larger rocks first,then a mixture of top soil and <br /> smaller rocks capping it with top soil only for future re-seeding. We are also willing to reclaim and <br /> reSPPd the old "arress" road that was used during prior mining operatinns in the past, at our rnct_ <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 2 H: I V <br /> (Note: If the Applicant proposes slopes steeper than 3H: 1 V (example 1 H:I V, 2H: 1 V, etc.),please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches �_6-8 inches <br /> 8-10 inches _F-1 10-12 inches <br /> _F-1 Other: <br /> N/A, explain: <br /> sP ara a nilP PrPraiitinnc will he used to salvage Alopsnel- <br />
The URL can be used to link to this page
Your browser does not support the video tag.