My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-20_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2020-08-20_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 8:12:58 AM
Creation date
8/21/2020 9:34:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
8/20/2020
Doc Name
2.05-50 Thru 2.05-88
Section_Exhibit Name
2.05.4 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.4 Reclamation Plan <br />Statement of Purpose and Pre Mining Land Use <br />The goal of Mountain Coal Company's reclamation plan is to return disturbed land at the West Elk <br />Mine site to a productive and useful status. It is recognized that many alternatives exist for restoring <br />the disturbed acreage. Some of these potential uses include rangeland, hayland or pasture, <br />forestland, wildlife habitat, recreation lands or residential, and light industrial use. <br />Mountain Coal Company proposes to return all disturbed lands to rangeland and wildlife habitat <br />land uses. These uses will be consistent with the present surrounding uses. Information presented in <br />Section 2.04.3 describes the pre -mining land uses in detail. <br />Reclamation activities will establish a permanent vegetative cover of the same seasonal variety <br />native to the area and capable of self -regeneration and plan succession equal in extent and cover to <br />the natural vegetation in the area. Any introduced species will be compatible with the plant and <br />animal species of the region. <br />Rehabilitation of the disturbed surface areas will be accomplished in increments as suitable areas <br />for reclamation become available. The facilities area will be returned to the approximate original <br />contour and the reclaimed land will have a minimum stability factor of safety of 1.3. Surfaces will <br />be dressed with previously stockpiled seedbed topsoil and planted with a variety of plant species. <br />. Planting will occur during the first normal period for favorable planting conditions after final <br />preparation of the reclaimed surface. <br />Bear Coal Company Reclamation <br />The Bear Coal Company is responsible for reclaiming its surface disturbances as stated in their <br />permit. However, there are three areas of the Bear Mine area that Mountain Coal Company will <br />disturb and will be responsible for reclaiming. They are the proposed Freshwater Pond No. 2, the 44 <br />KV power line outside of the Delta -Montrose Electric Association corridor, and the spoil stockpile <br />area described in Exhibit 47. These areas have or will be reclaimed by Mountain Coal Company <br />according to Bear Coal Company's reclamation plan in Exhibit 64, except that MCC's approved <br />seed mixtures shall be utilized. <br />Reclamation Methodology <br />Topsoil Salvage <br />Mountain Coal Company recognizes the importance of topsoil to plant and animal life of the area. <br />For this reason, all useable topsoil has been and will continue to be salvaged and stockpiled for later <br />use to cover reclaimed surfaces. To evaluate the soils present before activity began, a survey of the <br />existing soils within the West Elk Mine site was conducted. Interpretations of the soil survey <br />indicated that the existing soil types were suitable for use as seedbed quality material. A listing of <br />0 the soil mapping units, their suitability for use as seedbed quality material, and pertinent <br />1.05-50 Revised Jan. 1996 RN03; <br />
The URL can be used to link to this page
Your browser does not support the video tag.