My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-20_REVISION - M2009053
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009053
>
2020-08-20_REVISION - M2009053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 2:12:39 AM
Creation date
8/20/2020 7:17:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009053
IBM Index Class Name
Revision
Doc Date
8/20/2020
Doc Name
Amendment to an Application
From
Robins Construction LLLP
To
DRMS
Type & Sequence
CN1
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMMIT ENGINEERING C 0 1 ENGINEERS & LAND SURVEYORS <br /> Mail: P.O. Box 1897 Alamosa, CO 81101 P: 719-589-6147 E: summitengco@gmail.com <br /> e 1aFCone <br /> eee:aM / �� Q 9e AM Ree Fee:$of <br /> 00 <br /> .00 <br /> The County accepts the attached proposal from the applicant as the fair market <br /> value of constructing a new bridge at Conejos County Road H.The construction <br /> of the bridge shall be in accordance with industry specification and standards and <br /> shall be inspected and approved by a professional engineer and by a county <br /> official or designee.The applicant shall warrant the bridge for workmanship 1 <br /> year.The applicant shall enter into a separate contract with Conejos County for <br /> the construction of said bridge.Should the construction of the bridge not occur, <br /> for any reason,the applicant shall pay the required road mitigation fee without <br /> any credit. <br /> III.Extension of Permit:An extension of the term of the permit may be requested by the <br /> applicant. A request for extension of the permit term requires a public hearing and <br /> recommendation by the Planning Commission and review and public hearing by the <br /> Board of Conejos County Commissioners. Any such request shall be made within the <br /> final eighteen(18)months of this permit and shall be subject to the Land Use Code's <br /> application for a new special use permit procedure. <br /> IV.Transfer of Ownership:Any permit for land use and mining approved in compliance <br /> with the Conejos County Land Use Code shall be binding upon the applicant, <br /> applicant's heir,and applicant's assigns.Further,this shall be construed as a covenant <br /> that runs with the land during the time the permit is in effect.The transfer of this <br /> permit to any new owner may occur only after a statement has be filed with the <br /> Conejos County Land Use Office by the transfcroc indicating that itibc/she will <br /> comply with the terms and conditions of this permit. <br /> V. Change in Conditions of Permit:Unless otherwise provided in the Conejos County <br /> Land Use Code,any proposal to change the permit conditions shall require a new <br /> Special Use Permit. <br /> VI.Violations of Conditions of Permit: Failure to comply with these permit conditions <br /> shall cause the permit to be revoked by the Board of the Conejos County <br /> Commissioners pursuant to the procedures set forth in Articie 16 of the Conejos <br /> County Land Use Code. <br /> VII. Complaint Procedure: In the event that a formal written complaint is made <br /> concerning the operation,the Applicants shall initially handle the complaint. If the <br /> formal complaint is tiled with Condos County,the County shall,within 7 days, <br /> transmit the complaint to the Applicants.The Applicants and the County Land Use <br /> Office may meet with the complainant to resolve the complaint.The Applicants shall <br /> provide a written response to the complaint within 21 days of receiving the complaint. <br /> If the complaint cannot be resolved,the complaint will be referred to the Planning <br /> C'ommiceinn,who shall review the complaint and offer recommendations to the <br /> Board of County Commissioners.The Board of County Commissioners shall then <br /> hold a hearing to determine the merits of the complaint.The Applicants and the <br /> County should strive to handle the complaint in a fair,transparent,and timely <br /> manner. <br /> VIII. Other Compliance:The applicant shall comply with the Colorado Division of <br /> Reclamation and Mine Safety rules and regulations(DBMS).A copy of the DRMS <br /> permit shall be provided to the Conejos County Land Use Office together with a <br /> a <br /> Job # 1200710MP - A Pagel 56of78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.