Laserfiche WebLink
SUMMIT ENGINEERING C 0 1 ENGINEERS & LAND SURVEYORS <br /> Mail: P.O. Box 1897 Alamosa, CO 81101 P: 719-589-6147 E: summitengco@gmail.com <br /> Reclamation Costs <br /> It is estimated that if independent contractors were hired by the State of Colorado to <br /> perform reclamation of the site, the cost would be broken out as follows: <br /> • Mobilization $8,000 <br /> • Seed & Mulch $9,000 <br /> • Grading $6,000 <br /> • Planting $4,000 <br /> • Water $800 <br /> • Demobilize $8,000 <br /> Total = $35,800 <br /> 5% Contingency= $1,790 <br /> Total Cost = $37,590 <br /> The total cost would be about $34,125. The entire pit is 34.807 acres more or less, so <br /> the costs of reclamation for the pit would be $1,080 per acre. <br /> Job # 1200710MP - A Page138of78 <br />