My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-11_PERMIT FILE - C1981038A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2020-02-11_PERMIT FILE - C1981038A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2020 3:29:31 PM
Creation date
8/18/2020 3:03:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
2/11/2020
Doc Name Note
delete
Doc Name
Figures & Tables
Section_Exhibit Name
delete
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br />TABLE 1. CRCUND :dA TE~2 <br />• A. Succested :dater Qualitu Parameters * <br />pH (field) <br />Conductivity at 25oC (field) <br />Temperature (field) <br />Total Dissolved Solids <br />Bicarbonate (HC03) <br />Calcium (Ca+2) <br />Carbonate (C03) ** <br />Chloride (CI ) <br />Magnesium (Mg+2) <br />Ammonia (NHj) <br />* Dissolved species concentration only. <br />September l6, I982 <br />P7itrate-Nitrite <br />Phosnhato (POg3 as P) <br />Sodium (Na+) - . <br />Sulfate (SOa) <br />Arsenic (AS) <br />Cadmium (Cd) <br />Zron (Fe) <br /> <br />Manganese (Mn) <br />Mercury (Bg) <br />Selenium (Se) <br />Zinc (Zn) <br /> <br />** First sampling only. <br />B. Succested 9aseline t9onitorinc Freovencu <br />• 1. Bedrock Aquifers *** <br />a. Measure field water quality parameters monthly (pH, <br />conductivity, and temperature). Record elevation <br />of the water Zeve1 in the well at time of sampling. <br />b. Sample water for complete chemical analysis semi- <br />annually. <br />Z. Alluvial Aquifers *** <br />a. Measure field water quality parameters monthly (pH, <br />conductivity, and temperature). Record elevation <br />• of the water Zeve1 in the well at time of sam~7ling. <br />b. Sample water for complete chemical analysis quarterly. <br />**" Aquifers monitored and monitoring Zocations will be dealt with on an <br />individual basis. Consult the Division early in the mine-planning <br />stage for specific requirements. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.