My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-18_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2020-08-18_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 9:11:10 AM
Creation date
8/18/2020 12:46:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
8/18/2020
Doc Name Note
Application , Cover Letter & Revised Pages
Doc Name
Application
From
Savage and Savage
To
DRMS
Type & Sequence
SL3
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OXBOW MINING, LLC <br />ELK CREEK MINE <br />CDRMS FILE C-1981-022 <br />PHASE II BOND RELEASE APPLICATION (SL -03) <br />Date of Request: August 20, 2020 <br />Permittee: Oxbow Mining, LLC (OMLLC) <br />Permit Number: C-1981-022 <br />Initial Permit Approval Date: October 11, 1983 <br />Mine Name: Elk Creek and Sanborn Creek Mines (Elk Creek Mine) <br />Bond Release Phase Requested: Phase II <br />Acreage: Current Permit Area: + 15,676.51 acres <br />Maximum Area Disturbed + 226.99 acres <br />Area Sought for Release: + 56.02 acres <br />Bonding Company: Lexon Insurance Company <br />Bond Number: 1069009 <br />Amount of Bond Release Requested: 85% of applicable reclamation bond amount for <br />Phase II bond release areas. <br />Total Bond Amount Currently Held: $4,500,000.00 <br />Current Actual Bond Liability Amount (as of RN -07. December 31, 2019): <br />$4,113,573.04 <br />The amount requested for release will be based on the amount determined to apply to the <br />reclaimed surface disturbance, drill holes, sites, and roads. This amount is being currently <br />calculated. When the bond amount applicable to the reclamation is determined, OMLLC <br />requests a total of 85% of the applicable bond amount for areas where Phase II bond release <br />is sought in accordance with CDRMS Rule 3.03.1(2)(b). The amount released will be the <br />difference between the value of 85% of the applicable bond amount and that amount <br />previously released for Phase I under SL -02 for the reclaimed areas where Phase II bond <br />release is now requested under SL -03. <br />Legal Description of the Area Requested for Bond Release: The following table, Oxbow <br />Mining, LLC Elk Creek Mine, 2020 Phase II Bond Release: Reclaimed Eligible Areas <br />presents the locations or sites to be considered for bond release under this application. The <br />........................................................................ <br />Oxbow Mining, LLC Elk Creek Mine Page 2 <br />5L-03 2020 Phase 11 Bond Release5ynopsis <br />
The URL can be used to link to this page
Your browser does not support the video tag.