My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-18_REVISION - M2018053
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2018053
>
2020-08-18_REVISION - M2018053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 7:47:31 AM
Creation date
8/18/2020 9:45:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018053
IBM Index Class Name
Revision
Doc Date
8/18/2020
Doc Name
Request for Technical Revision
From
Greg Lewicki & Accociates
To
DRMS
Type & Sequence
TR1
Email Name
DMC
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OF cot <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAY <br /> 1313 Sherman Street, Room 215, Denver,Colorado 80203 ph(303)866- yr_ ':E <br /> 87 <br /> � o zozo <br /> REQUEST FOR TECHNICAL REVISION JR) COVER SHEEP"" <br /> JBUSIOW <br /> File No.: M- <br /> 2018-053 Site Name: Box Creek Placer Mi[ <br /> County Lake TR# (DRAPY I,sw only) <br /> Permittee:Titan Au, Inc. <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Katie Todt, Lewicki and Associates <br /> Please provide a brief description of the proposed revision: <br /> Revegetation plan changes to update the seed mix used to be applied via broadcast at double <br /> the dFill Fate. Use of droll seeding, disking, and erimping is not effeetive at the site due to Feek-y— <br /> overburden and will no longer be utilized in future revegetation efforts. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee. the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR, however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 11 Oc, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> H 2 hard rock (not DMO) $175 ❑ <br /> IIOd, II2d(1. 2 or3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.