My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-18_REVISION - M2018053
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2018053
>
2020-08-18_REVISION - M2018053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 7:47:31 AM
Creation date
8/18/2020 9:45:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018053
IBM Index Class Name
Revision
Doc Date
8/18/2020
Doc Name
Request for Technical Revision
From
Greg Lewicki & Accociates
To
DRMS
Type & Sequence
TR1
Email Name
DMC
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ej <br /> .i '� 1i �' „ { i• st # =i3 iic i .'.tt}8-12 `.d i 4• i10) 34 4 <br /> 1 ,;ti.i <i. { d: 4.i4 i „°.4s# ;iiE !+•tiii•d,,,-tzir <br /> August 13. 2020 <br /> Dustin Czapla <br /> Colorado Division of Reclamation, Mining and Safety �,� ��`(:)Z <br /> 1313 Sherman Street, Room 215 �`' a�Gk. M,OgkON <br /> Denver, CO 80203 ON1MNI���Np�AFE'(`I <br /> 303-866-3 567 <br /> Delivered Via Ismail and Hard Copy <br /> RE: In the Matter of the Box Creek Placer Mine, Permit No. M-2018-053, <br /> Technical Revision-01 <br /> Mr. Czapla: <br /> Titan Au. Inc. would like to alter their revegetation plan at the Box Creek Placer Mine (M- <br /> 2018-053) in accordance with section 3.1 Revegetation Flexibility on page E-3 of their <br /> approved permit which reads "Once Titan Au has found successful strategies for <br /> revegetation. it will submit a revision to this permit to allow the use of those strategies on <br /> the rest of the site as appropriate."" Reclamation efforts during the 2020 season have <br /> yielded high germination results through broadcast seeding and two-inch harrow site <br /> processing. Furthermore, initial attempts to disc the land, drill seed, and crimp mulch were <br /> ineffective due to the high rock content of the replaced overburden and will not be used in <br /> on site future reclamation efforts Titan Au. Inc. owns and operates all of the above <br /> equipment but is highly pleased with results for 2020 using the broadcast spreading and <br /> harrow method. <br /> Please allow the following text, as Technical Revision 1, to replace the current <br /> Revegetation Plan. <br /> 3. Revegetation Plan <br /> For each area of reclamation, lands will not need to be disked to loosen the soil as all soils <br /> to be reclaimed will be recently filled topographic lows throughout the site that previously <br /> served as sediment settling ponds and deposits for sluice reject sediments that result in <br /> settled but unconsolidated soils as opposed to traditional hard packed reclaimed earth. <br /> Slopes will be backfilled, regraded, and retopsoiled as soon as they are able to be <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.