Laserfiche WebLink
Peak Ranch Resource <br /> August 5, 2020 <br /> Table G-1: Peak Ranch Phase 1 -Estimate of Gravel Resource Water Demands <br /> Net Evap. Net Mined Material First/Initial Fill Water Lost in Water for Total New <br /> Rate Evap. Above GW Below GW Total Washed Dust Control Depletions <br /> Production <br /> Month (af/acre) (af) (af) (Tons) (Tons) (af) A (af) (af) <br /> Jan 0.00 0.0 0 0 0 0.00 0.00 0.00 0.00 <br /> Feb 0.00 0.0 0 0 0 0.00 0.00 0.00 0.00 <br /> Mar 0.00 0.0 0 0 0 0.00 0.00 0.00 0.00 <br /> Apr 0.16 0.0 36,000 0 36,000 0.00 0.00 0.25 0.25 <br /> May 0.29 0.0 40,000 0 40,000 0.00 0.00 0.30 0.30 <br /> Jun 0.40 0.0 44,000 0 44,000 0.00 0.00 0.30 0.30 <br /> Jul 0.37 0.0 60,000 0 60,000 0.00 0.00 0.29 0.29 <br /> Aug 0.29 0.0 60,000 0 60,000 0.00 0.00 0.32 0.32 <br /> Sep 0.25 0.0 56,000 0 56,000 0.00 0.00 0.25 0.25 <br /> Oct 0.16 0.0 72,000 0 72,000 0.00 0.00 0.25 0.25 <br /> Nov 0.02 0.0 32,000 0 32,000 0.00 0.00 0.13 0.13 <br /> Dec 0.00 0.0 0 0 0 0.00 0.00 0.00 0.00 <br /> TOTAL 1.95 0.00 400,000 0 400,000 0.00 0.00 2.08 2.08 <br /> Notes: 1)Net unit evaporation rate <br /> 2)Equals Column(1)x the exposed water surface <br /> 3)Tons of material mined from above the groundwater table <br /> 4)Tons of material minded from below the groundwater table <br /> 5)Total excavated material removed during the month=Column (3) +Column(4) <br /> 6)Equals Column(4)x 2,000/120/43,560 x(1-0.3)-Column(4)x 4%x 2,000/62.4/43,560 <br /> 7)Processing of mined material will occur at the Maryland Creek Ranch Resource <br /> 8)Estimated based on average historical rate(42,343 square feet of area per acre-foot of water)and historical distribution at the Maryland Creek Ranch Resource.9) Equals Column(2) <br /> +Column(6)+Column(7)+Column(8) <br /> 1-r-' Iwwitki a. 1-1-1-1 PI.1.( G-5 O TETRA TECH <br />