Laserfiche WebLink
Plewmo-n-ft... <br /> CC&V Wildlife Protection Plan <br /> Table of Contents <br /> 1 Introduction.........................................................................................................................................................................................................2 <br /> 2 Preventive Measures within Respective Areas of Activity................................................................. ..............................................3 <br /> 2.1 Lined Ponds ..........................................................................................................................................................................................3 <br /> 2.2 Active Leaching or Process Facilities—(>SO ppm cyanide concentration)......................................................................3 <br /> 2.3 Mine Area and Other Excavations or Disturbances.............................................................................................................. ...3 <br /> 2.4 Haul Roads and Access Roads...........................................................................................................................................................4 <br /> 2.5 Buildings and Administrative Areas................................................................................................................................................4 <br /> 2.6 Property-Wide Considerations...........................................................................................................................................................4 <br /> 3 Maintenance and Inspections of Preventive Measures.......................................................................................................................5 <br /> 3.1 Inspections..................................................................................................................................................................................................5 <br /> 3.2 Maintenance...............................................................................................................................................................................................5 <br /> 4 Legacy Considerations......................................................................................................................................................................................5 <br /> 4.1 Reclamation..............................................................................................................................................................................................5 <br /> 4.2 Biodiversity..................................................................................................................................................................................................6 <br /> 4.3 Sustainabillty.............................................................................................................................................................................................6 <br /> 5 Reporting Wildlife Findings...........................................................................................................................................................................6 <br /> 5.1 Injured or Sick Wildlife..........................................................................................................................................................................6 <br /> 5.2 Wildlife Mortalities...............................................................................................................................................................................6 <br /> Introduction <br /> All aspects of the Cripple Creek and Victor gold mining Company's (CC&V) operations shall take Into account the <br /> safety and protection of wildlife on the mine site, at processing sites, and along all access roads to the mine site. <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT Doc Id NNA-CCV-ER-Plan-E_042 <br /> CCV S&ER Date of This Issue 2/20/2019 Date of Next Review 2/20/2022 Page 2 of 13 <br />