Laserfiche WebLink
6.1. System Analysis.............................................................................................................. 21 <br /> 6.1.1. System Inflow Evaluation................................................................................ 21 <br /> 6.1.2. System Outflow Evaluation............................................................................. 22 <br /> 6.2. Discussion of Results...................................................................................................... 22 <br /> 7. USE OF THIS REPORT.............................................................................................................. 23 <br /> 8. REFERENCES........................................................................................................................... 23 <br /> LIST OF TABLES <br /> Table 5.1—Stability Evaluation Material Properties..................................................................... 14 <br /> Table 5.2—Summary of Calculated Factors of Safety.................................................................. 16 <br /> Table5.3—Material Properties .................................................................................................... 18 <br /> LIST OF FIGURES <br /> Figure 1 VLF2 Phase 3 Grading Plan <br /> Figure 2 Ultimate Ore Stacking Plan <br /> Figure 3 Phase 3 Cross Sections (1 of 2) <br /> Figure 4 Phase 3 Cross Sections (2 of 2) <br /> Figure 5 PSSA Filling Curve <br /> LIST OF DRAWINGS <br /> A00 Cover Sheet <br /> A01 General Arrangement <br /> A02 Site Geology Map <br /> A03 Borehole Locations <br /> A04 Phase 3 Pad Grading Plan <br /> A05 Phase 3 Pad Isopach <br /> A06 Phase 3 Geomembrane Limits <br /> A07 Phase 3 Stage A Grading Plan <br /> A08 PSSA Layout <br /> A09 Phase 3 Stage B Grading Plan <br /> A10 Phase 3 Stage C Grading Plan <br /> All High Volume Solution Collection Piping Layout <br /> Al2 Phase 3 Stacking Plan <br /> A13 VLF Cross Sections (Sheet 1 of 2) <br /> A14 VLF Cross Sections (Sheet 2 of 2) <br /> A15 Leak Detection and Erosion Control Details <br /> A16 VLF Sections and Details (Sheet 1 of 2) <br /> A17 VLF Sections and Details (Sheet 2 of 2) <br /> A18 PSSA Sections and Details (Sheet 1 of3) <br /> A19 PSSA Sections and Details (Sheet 2 of 3) <br /> A20 PSSA Sections and Details (Sheet 3 of 3) <br /> A21 PSSA Riser Sections and Details (Sheet 1 of 2) <br /> A22 PSSA Riser Sections and Details (Sheet 2 of 2) <br /> A23 Low Volume Solution Collection Riser Details <br />